Machine waste is calculated by three main factors: Good Material, Bad Material, and Total Material. Total Material is a measure of all (total) material produced by the machine. Good Material is calculated by summing the machine’s good material output – the material that is deemed to have acceptable quality. Bad Material can be determined by […]