One of the Recipe Management tools provided is the Run Estimator, which calculates the estimated duration for a recipe run. You can access this tool from the Recipe Management module, under Catalog & Load. Clicking the icon will open the Recipe Run Estimator.
The Run Estimator is only available for recipes which have been loaded at least once, and are in version higher than 1.
Enter a value in the Target Material box for the target material (measured in units for your machine).
Input a target start date and time in the boxes provided (defaults to current date and time), then click Update.
The estimated end date and time will be displayed in bold under the input boxes provided.
© 2024 ei3 Corporation. Content of this web page is proprietary to ei3 Corporation.